Control Shift · Construction systems

BOQ Software and Management Systems in Dubai

Build a controlled bill of quantities workflow from the first tender issue to the awarded project budget. Control Shift develops BOQ management software for estimators and quantity surveyors who need consistent item codes, units, rates and revision history across UAE construction projects.

For estimating teams, quantity surveyors, main contractors and specialist subcontractors preparing or reviewing tender quantities.

A workflow we can build around your team
  1. Register the source

    Traceable tender document set

  2. Structure the items

    Reviewed BOQ register

  3. Build and approve rates

    Approved estimate revision

  4. Hand over the award

    Controlled project budget baseline

Proposed workflow. Final roles, records and approvals are agreed during discovery.

Keep every quantity attached to the right revision

A revised drawing, a changed unit or an excluded scope item can alter an estimate even when the spreadsheet total looks reasonable. Construction quantity software needs source references and review states as well as arithmetic. A BOQ register organises measured items; quantity takeoff derives measurements from drawings or models and must be scoped separately.

Structured BOQ import and editing

Import agreed Excel or CSV layouts into sections, work packages and stable item IDs. Preserve descriptions, units, quantities, provisional allowances and exclusions. Flag missing units, duplicate references and unpriced items for estimator review.

Rate build-ups and estimating libraries

Build rates from materials, labour, equipment and subcontract inputs. Version rate sources, effective dates, wastage assumptions, preliminaries and markups so a reviewer can understand how each tender amount was assembled.

Tender revisions and comparisons

Compare issued revisions by item identity and scope. Show added, removed and changed quantities, rates or descriptions. Preserve the earlier issue and require a reviewer to approve the revision used for submission or internal budgeting.

Award-to-budget handover

Freeze the accepted tender issue and map its work packages to project cost codes. Keep commercial selling rates distinct from internal cost allowances. Carry approved scope, quantities and references into procurement and cost control.

From the first record to an approved result

Each handover has an owner, a required input and a recorded outcome. We define the exceptions alongside the normal process.

  1. Step 1

    Register the source

    Document controller

    Record tender issue, drawing or schedule references and the received revision.

    Output: Traceable tender document set

  2. Step 2

    Structure the items

    Estimator or QS

    Check units, quantities, scope boundaries and missing or provisional items.

    Output: Reviewed BOQ register

  3. Step 3

    Build and approve rates

    Estimator + commercial reviewer

    Apply rate sources and review changes against the previous tender issue.

    Output: Approved estimate revision

  4. Step 4

    Hand over the award

    Commercial + project controls

    Map the awarded scope to cost codes and distinguish cost from selling values.

    Output: Controlled project budget baseline

Illustrative workflow example

What a BOQ revision should show

Illustrative partition item, measured in square metres. This demonstrates quantity review, not a measured project or market rate.

Scroll horizontally to view all columns.

What a BOQ revision should show — illustrative records
FieldTender issue ATender issue B
Item referenceFIN-042FIN-042
DescriptionPartition package, zone 2Partition package, zone 2
Unitm²m²
Quantity120138
Drawing referenceA-201 revision 02A-201 revision 03
Review statePrevious approved baselineQuantity change awaiting QS review

The 18 m² difference does not authorise a purchase or a contract variation. The reviewer checks measurement rules, exclusions and the source revision before approving downstream changes.

BIM, drawing and ERP integration

BIM integration can map authorised model exports or available APIs to BOQ references, locations and model-element IDs. Confirm file formats, model quality, licensing and measurement rules first. Model quantities and extracted schedules remain reviewable inputs; an import should never silently replace an approved BOQ.

Hand over approved BOQs to construction cost control

AI BOQ extraction with an estimator review queue

Extract candidate rows from permitted PDF or scanned schedules, retaining document, page and revision references. Mark uncertain units and merged cells for review and compare corrected output with a representative sample. AI extraction is different from reliable drawing measurement; final quantities, rates and tender submissions remain with qualified staff.

Explore document extraction and review workflows

Scope, build and validate with Control Shift

Scope depends on document formats, rate-library complexity, revision matching, drawing or BIM requirements and the amount of historical data. A structured BOQ register can be delivered before PDF extraction or model integration. Include review effort and document-processing usage in the operating budget.

Bring these inputs to discovery

  • An anonymised tender BOQ and two revisions of the same package
  • Rate build-up examples, measurement rules and approval responsibilities
  • Expected Excel, PDF or model inputs and the target project cost-code format

Agree these acceptance checks

  • Import and export preserve item IDs, units, decimal precision and section totals.
  • A revised item shows its source and reviewer without overwriting the approved baseline.
  • Awarded selling rates and internal cost budgets remain separate during handover.

Implementation and ownership

Discovery produces a workflow and data map, a prototype, an integration plan and an itemised delivery scope. Validate a trial migration and pilot with the people who use the system. Agree access roles, backups, deployment responsibilities, source-code handover, third-party licences and support terms before rollout.

Control Shift serves project teams in Dubai and across the UAE. Your project locations, languages and existing systems determine the rollout plan. Where a packaged platform already meets the requirement, configuration or a focused integration may be the appropriate scope.

FAQ

BOQ and estimating — common questions

No. BOQ management organises items, units, quantities, rates and revisions. Quantity takeoff measures work from drawings or models. A project can include both, but drawing formats, measurement rules and validation responsibilities need their own scope.

Yes. We start with representative files to map sections, formulas, units, descriptions and item references. Merged cells, inconsistent codes and missing quantities need review. Import and export totals are checked against agreed samples before rollout.

AI or document-processing tools can prepare candidate rows from supported PDFs and scans. Preserve page references and send unclear quantities, units and table structures to an estimator. Accuracy must be measured on your document set; no extraction output should become a final tender without review.

It can be scoped around available APIs or authorised model exports. Agree element IDs, location mapping, revision rules and licensing first. The integration should preserve evidence and flag changes for review instead of assuming all model quantities are suitable for commercial use.

Only an approved workflow should change a controlled budget. Keep document changes, measured quantities, commercial variations and authorised budget revisions as distinct states, linked by references and reviewer history.

Turn your workflow into a scoped software project

Tell us where work gets delayed, which systems you use and what a useful first release needs to achieve. Start with a process description; anonymised sample records can be reviewed during discovery.

We will map requirements, clarify integration access and prepare a phased proposal for boq software development.

Discuss your construction software project